The main part of the bracket has now been drilled and the
holes countersunk. I cut down four screws and will be using both flat and crinkle
washers. The preformed channels have had one end folded over and silver
soldered. The next job is to clean up the brass and position the first channel
ready for soldering. I plan to hold the channel in place with some bent paper
clips. Hopefully this will do the job without the parts moving about. Once the
first one has been soldered in position I’ll arrange the second channel so that
the top part of the bracket slides in without binding. After both have been
soldered I’ll have the fun of cleaning it all up.
No comments:
Post a Comment